Posts

NPP Projection Close 12/3

To do this evening/ was completed: Presentation Issues: MODs reported a noise complaint from a guest in theater 4 who said they could hear Renaissance  through the walls (it was playing below in theater 1) so this was lowered; the volume cue is set to 6.0 and any lower is still a bit too soft once the concert proper begins Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Renaissance  one sheets were delivered and stored behind 3/7 + a new archive tube was started with one of these posters Ordering/Receiving (content): Outgoing/Shipping (content): Titanic  print (shipped in two boxes) was placed on the cart for its scheduled pickup tomorrow morning Print/video Inspection: Re-inspected Lethal Weapon  in booth 1 and packaged it for return shipping (a second print of this same film is in the booth and both can be scheduled for pickup once Titanic is taken back tomorrow) + left the canisters at the foot of th...

NPP Projection Open 12/3

To do this evening/ was completed: Lethal Weapon print screening went smoothly in T1. Projectors cleaned afterward. Printed out labels for Titanic outgoing, print by the side entrance. Content all set for the next week aside from  Christmas Vacation, which screens next Saturday. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Report 12/2/23 Close -Chris-

To do this evening/ was completed: The very definition of a babysitting shift, two manual starts and one chair removal. Presentation Issues: The 1.33 portions of Maestro  reveal some fairly heavy keystoning in T2, this is probably not news to any of you, kinda miraculous we have any straight lines in there with angling of that booth! Preshow Clips/Playlist: Looked thru some of your upcoming SE SPLs and things seem to be in order tho I'm not yet super great at parsing out the user interface on this version of TMS as I am exposed to it rather infrequently. Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Marquee updated?: Posters updated?: Cleaning lights on for the night?: Projection cart by entrance?: Additional Notes:

NPP Projection Close 12/1

To do this evening/ was completed: Quiet night spent inspecting the Cobra print we received yesterday. It's in good condition, minimal repair, resting on house reels. Boy and the Heron preshow content ingested. Tech'd The Holiday, volume is good at 5.5. Someone in T1 asked us to turn Renaissance up, right as the film was starting. I bumped it very slightly, as 6.0 is definitely loud enough for the main musical sequences. I scheduled the Spoons MediaBlock playlist for tomorrow just a heads up. Presentation Issues: Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Outgoing/Shipping (content): Print/video Inspection: Asset tracking doc updated/checked?: Maintenance/cleaning: Cue sheets updated/checked (every shift): Yes Marquee updated?: Posters updated?: Cleaning lights on for the night?: Yes Projection cart by entrance?: Additional Notes:

NPP Projection Report 12/1 Admin Alec & Lillian

To do this evening/ was completed: Presentation Issues: Preshow Clips/Playlist: Downloaded and ingested next week's forecasts and Waiting to Exhale and Live Wire trailers. Downloaded  The Boy and the Heron  15min preshow content and the 5min preshow content. Please ingest when done.  Built all A1 playlists for the week of 12/08 (apart from Boy n Heron /  T6 playlists as we have yet to received the film schedule!) Built and scheduled the Christmas Evil playlist. We'll need to grab the exact credit offset on Monday but I got the timing for cue sheets (the movie is on Tubi, of course). Trailer Updates: Special Events/ AV set up: Set up Spoons for tomorrow, with wireless mics connected to the PA speakers. Ordering/Receiving (posters & trailers): Ordering/Receiving (content): Moved Fantastic Planet over to the TMS from T1 and deleted it from 1 since it's not screening for a while. Ingested Kiss Kiss Bang Bang to Theater 4 Outgoing/Shipping (content): Cleared Ma...

NPP Projection Close 11/30

To do this evening/ was completed: Presentation Issues: BeyoncĂ© is following swiftly (pun intended) behind Taylor in giving us another very long and loudly mixed concert film...the servers in T2 noted that the film sounded too low to start with (it was originally set to 5.0 in the SPL), so after testing the volume at 7.0 and 6.5 (levels both far too loud once the bass really starts thumping following Queen B's introductory remarks), I brought it down to 6.0 which, admittedly, is still quite loud, but not loud enough to be as punishing or distracting in adjacent theaters as The Eras Tour  seemed to be to many of our guests...this volume setting may need to change if and when we move the film into other (smaller) auditoriums but, for now, it is playing comfortably to the near sold out crowd here tonight Preshow Clips/Playlist: Trailer Updates: Special Events/ AV set up: Titanic screening in theater 1 this evening went very smoothly; Ariel had his DJ set this evening down at Trees Lou...

Projection Admin 11/30 Lil & Jack

Image
To do this evening/ was completed: Hey projection - I know the following is lengthy, but please take the time to read.       Had some last minute troubleshooting with the Beyonce  feature as it came with supplementary packages (we get these sometimes depending on the feature) and I'll explain this as best I can since it's actually rather confusing, especially if you've never dealt with this before. The feature we received (which were/are the only available CPLs on Eclair and have the date 20231124 in them) are essentially "base" versions and you need to ingest and keep them on the server, then upload the supplementary packages (VF "version file" content in the email with the keys! this is VERY easy to miss, especially since it's so rare we have to do this. I've attached an image below of the packages in the KDM email, which are below the keys. You will download and ingest these just as you do with KDMs. Extra confusing seeing as how they're n...