Projection Report 10/21 Admin/Open



Presentation Issues: There were none.

Preshow Clips/Playlist: Made a Vincent Price pre-show for teching with Caryn tomorrow. Dropped the feature and PL into TH3. Just missing the art slide show and VP static slide for the intro/Q&A. Put in an ask to Kris about these elements.
I added a cleaning lights cue for the BHFF film fest Q&A portion. I think any Q&A's happening in the smaller theaters (without the LED cleaning lights) where we don't have a lighting panel should be done with cleaning lights on.

The new 5.1 pre-shows are taking a while to load and so I have asked Dylan to transfer those to TH1,5,7,6 tonight so they are all ready for Kris tomorrow morning.

Trailer Updates: n/a

Special Events/ AV set up: We had a 10 am walk through/meeting about the private STB event for 11/3 in TH6. We decided on cleaning lights during the talking parts/contests in lieu of spots/stage wash. We showed Michael how to control the house lights so that on the day of we can hand him a laptop or ipad with the IMS macro-execution menu for TH6 loaded. We also discussed table layout (an L shape with the narrow wood topped tables in front of the screen, house left) along with Michael's set up, close to, but not blocking, the service entrance.

Mascha, we forgot to mention timing to Michael (At least I wasn't there if it was) in that we will need him to keep his pre-show to 15 min for an 11:00 am door/ 11:15 start/ 1:15 hard-out.

TH3 is all set for BHFF Blood and Flesh with 4 mics and 4 directors chairs as per Liz's amended instructions. I stuck around until the beginning of the movie to make sure Dylan is all set with the flow.

Ordering/Receiving (posters & trailers): n/a

Ordering/Receiving (content): Jojo Rabbit and our Halloween mix DCP's came in. Ingested Jojo.

Outgoing/Shipping (content): n/a

Print/video Inspection: n/a

Asset tracking doc updated/checked?: yes for Jojo.

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?: took down marriage proposal but BHFF 10/17-24 back up

Posters updated?: n/a

Cleaning lights on for the night?: n/a

Projectors off for the night?: n/a

Projection cart by TH5?: n/a

Nest:

Additional Notes: I had more platter practice. Made my first big mistake (now's the time to make 'em!) and got some serious brain wrap so we took the opportunity to run it from platter to platter and actually cut the film to make a much shorter test reel (about 5 min) so that we can run it back and forth 2-3 times per practice session instead of just one. When we actually test lighting cues we might want to splice it back together.

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian