NPP Projection Report Friday 1/31 CLOSE Chris



Presentation Issues:
-I believe Karen thoroughly covered this in an email but there were serious issues with the CP500 for the 6:20 Lil Women; no sound for the first three minutes and it dropped out again the very moment the 500 was taken off manual. The last foil cues continue to fail to fire. The platter worked fine, tho it is not a graceful competence, double-wrapping the film around the brain in the first fourth of the movie before the motor kicks in.

-The Rhythm Section SPL had it's LTS DOWN cue set to fire at the beginning of the 10 count preshow portion, rather than the end when the trailers hit. Fixed that.

Preshow Clips/Playlist:

Trailer Updates:N/A

Special Events/ AV set up:N/A

Ordering/Receiving (posters & trailers):N/A

Ordering/Receiving (content):N/A

Outgoing/Shipping (content):
-Alec mentioned that he walked some drives back before he left.

Print/video Inspection:
-Tech'd Groundhog's Day, set vol for 5.0, tho if we had a vol 4.8 cue in the SPL builder (or if I knew how to program macros) I'd probably use that.  5 seems a little loud in some of the more bombastic parts, but 4.5 seemed too low for the talky parts (aka most of the film). Set a 4.5 cue mid credits to tone down the closing song which kinda blasted.

Asset tracking doc updated/checked?:
-Yes, added Groundhog's Day  and all relevant info.

Maintenance/cleaning:N/A

Cue sheets updated/checked (every shift): Yes checked tomorrow against scheduler

Marquee updated?:N/A

Posters updated?:N/A

Cleaning lights on for the night?:Yes

Projectors off for the night?:yes

Projection cart by TH5?:Yes

Nest:

Additional Notes:
Overheard guests who thought the third floor corridor smelled off, like BO. I think they were catching actual wind of the locker room, which is definitely making it's way into the hall. Might wanna put up a deodorizer or some such thing.

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian