NPP Projection Report Thursday 1/23 CLOSE Chris



Presentation Issues:
-None per se, but TMS crashed around 11:30pm, attempts to reboot via web-based control panel failed, unaware of hard reset procedure. This unfortunately prevented me from teching Honeyland, but the "Valentines" trailer was already loaded up in T7 so I was at least able to run that.

Preshow Clips/Playlist:
-Honeyland can be found under the playlist SE_HONEYLAND_012820, totally built out and awaiting feature teching.

Trailer Updates:
-Pulled TLR_NPP_VALENTINES off of EVO and into TMS, inserted it into all trailer packs and cleaned up any preshows that ran significantly over 40mins as a result.

Special Events/ AV set up:N/A

Ordering/Receiving (posters & trailers):N/A

Ordering/Receiving (content):
-Brought Honeyland in from Eclair.

Outgoing/Shipping (content):
-Frozen 2 has left the building.

Print/video Inspection:
-Tech'd "Valentines" trailer, looks and sounds fine at preshow settings.

Asset tracking doc updated/checked?: Yes added what I could for Honeyland.

Maintenance/cleaning: N/A

Cue sheets updated/checked (every shift):
-Scheduled thru Thursday 1/30 in TMS, save for unbuilt SPLs, Shining, For Sama, Edge of Democracy.

Marquee updated?:
-Frozen 2  came down

-The Gentlemen went up.

Posters updated?:
-The Gentlemen moved to the 15th st Now Playing block.

-Birds of Prey moved back out to the 14th st poster block

-Portrait of a Lady on Fire made it's way into the vestibule.

-Frozen 2 poster came in, it's in rough shape after all that time outside but I wasn't sure if we'd archived one yet so I slotted it into a blank poster space.

Cleaning lights on for the night?:Yes

Projectors off for the night?: Yes

Projection cart by TH5?:Yes

Nest:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian