NPP Projection Report Thursday 1/23 CLOSE Chris
Presentation Issues:
-None per se, but TMS crashed around 11:30pm, attempts to reboot via web-based control panel failed, unaware of hard reset procedure. This unfortunately prevented me from teching Honeyland, but the "Valentines" trailer was already loaded up in T7 so I was at least able to run that.
Preshow Clips/Playlist:
-Honeyland can be found under the playlist SE_HONEYLAND_012820, totally built out and awaiting feature teching.
Trailer Updates:
-Pulled TLR_NPP_VALENTINES off of EVO and into TMS, inserted it into all trailer packs and cleaned up any preshows that ran significantly over 40mins as a result.
Special Events/ AV set up:N/A
Ordering/Receiving (posters & trailers):N/A
Ordering/Receiving (content):
-Brought Honeyland in from Eclair.
Outgoing/Shipping (content):
-Frozen 2 has left the building.
Print/video Inspection:
-Tech'd "Valentines" trailer, looks and sounds fine at preshow settings.
Asset tracking doc updated/checked?: Yes added what I could for Honeyland.
Maintenance/cleaning: N/A
Cue sheets updated/checked (every shift):
-Scheduled thru Thursday 1/30 in TMS, save for unbuilt SPLs, Shining, For Sama, Edge of Democracy.
Marquee updated?:
-Frozen 2 came down
-The Gentlemen went up.
Posters updated?:
-The Gentlemen moved to the 15th st Now Playing block.
-Birds of Prey moved back out to the 14th st poster block
-Portrait of a Lady on Fire made it's way into the vestibule.
-Frozen 2 poster came in, it's in rough shape after all that time outside but I wasn't sure if we'd archived one yet so I slotted it into a blank poster space.
Cleaning lights on for the night?:Yes
Projectors off for the night?: Yes
Projection cart by TH5?:Yes
Nest:
Additional Notes:
Comments
Post a Comment