NPP Projection Report 2/12 Open


To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist: Made and ingested the Moonstruck slide, updated the playlist and cue sheets.

Trailer Updates:

Special Events/ AV set up: The Earth Girls screening in Theater 1 went quite well. The jitter on projector #2 is resolved, though I did notice the image appears to wobble very faintly, mostly at the sides. It’s not showstopping, and though it’s possible this is a remnant of the jitter issue it seems to be separate. I replaced the studio guide that DMS removed from the trap and will come in early to test it tomorrow and see if this helps.

Double checked the cable connection in Trees Lounge and Theater 1, both are good to go for the Super Bowl tomorrow.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Finished inspecting Shattered, the print is in pretty terrific shape. For some reason reels 2 and 4 had more vertical base scratches than the others, likely these reels were ran through a projector which scratched it during a changeover show. They are light enough that they shouldn’t really show on screen.

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projectors off for the night?:

Projection cart by TH5?: In 3/7 with the prints getting picked up on Monday. They are labeled outgoing.

Nest:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24