NPP Projection Report 2/20 Open


To do this evening/ was completed: Continued sorting VHS vault, will finish tomorrow during my closing shift.

Presentation Issues:

Preshow Clips/Playlist: Built and scheduled playlists for How to Train Your Dragon and Trees Lounge preshow.

Ingested Oscar Shorts preshow and some new NPP trailers.

Trailer Updates:

Special Events/ AV set up: The Lost Boys 35mm screening went well. There was a minor blip at the first changeover, when I hit the switch to turn on the motor it didn’t come on. I had accidentally hit a switch on the front of the projector (labeled “platter”) when sweeping the booth before the screening and hadn’t noticed, apparently this controls the motor. I quickly turned the switch on and started the second reel, there was about 5 seconds of leader on screen due to this. The reason I figured it out so quickly was because I hit a different switch while sweeping (labeled “proj”) which caused the light inside the projector body to go off, so I noticed this one right away but didn’t see that the platter switch had also been turned off until I went to start the second reel. 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Ingested Princess Kaguya to Theater 3.

Outgoing/Shipping (content): Fleshtone materials should be getting picked up tomorrow (2/21). I’ll schedule a pickup for The Lost Boys for Tuesday as the Fleshtone boxes are taking up all the space on the cart. The print is packed up in booth 1 and ready to return.

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Swept and mopped the floor in booth 1.

Cue sheets updated/checked (every shift): Updated cues for How to Train Your Dragon.

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projectors off for the night?:

Projection cart by TH5?:

Nest:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian