NPP Projection Report 3/16 Admin

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Set up three mics in Theater 3 for the intro and Q&A tonight. Spotlight remote is in the box behind the curtain to the right of the screen. Playlist is ready to go as well. Left one mic stand under the curtain for the intro, they will need three chairs for the Q&A.

Ordering/Receiving (posters & trailers): Received a new Trail Mix drive.

Ordering/Receiving (content): Ingested the DCP for the private event on 3/29 in Theater 2. The hosts watched the DCP in full along with a couple members of their crew. They had a few questions about the sound, mainly why there was no sound coming from the rear surround speakers and I told them that since it has a 5.1 mix those speakers would not be active. I ended up playing it quite loud for them at 8.0. Overall I think they were happy with it, though they said they may give us a new DCP with a 7.1 mix but will confirm/coordinate picking up their drive if they decide to do this.

DCPs for Steel Magnolias and Akira arrived. Ingested both to Theater 1, transferred Akira to Theater 2 for its encore screening on Thursday 3/24.

Downloaded and ingested the two updated DCPs to Theater 2 for the NSF encore programs this weekend.

The Careful print came in.

Started downloading the Inspector Ike DCP to our hard drive.

Outgoing/Shipping (content): The Showgirls print got picked up.

Print/video Inspection: Teched Manchurian Candidate and X playlists. Both are ready to go, added credit lights cues to X.

Inspected the first four (of six) reels of Careful, print is in overall pretty good condition although I had to repair a decent amount of torn sprocket holes in the third and fourth reels. Third reel is a good bit more scratched than the others, and there are splices throughout all reels. Lots of pretty big edge nicks in the third and fourth reels too, should go through the projector fine though as sprocket holes weren’t torn.

Asset tracking doc updated/checked?: Yes, updated with inspection info for X and Careful. Updated entries for Akira and Steel Magnolias as well.

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Updated credit times for all X screenings.

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projectors off for the night?:

Projection cart by TH5?:

Nest:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24