NPP Projection Report 6/13 Admin

To do this evening/ was completed: 

Presentation Issues: The image for the pre-show during the first round in theater 4 (Jurassic World Dominion) was blurry from the auditorium being too hot so I removed the port glass to wipe it down, which in turn caused the projector lens to fog over, throwing off the image on screen. After some minor troubleshooting I was able to center and focus the lens file for the rest of the pre-show and waited until the feature to start to see if the 2.00:1 file was also affected -- it was -- then adjusted that accordingly. I also reached out Jack about resetting these again after the show concludes in order to avoid any further issues with the picture, however, the same can not be said for the hammering outside, which only stopped after the first few minutes of the feature had come to pass

Preshow Clips/Playlist: Downloaded and ingested all available pre-show content and built a show playlist for Lightyear (also scheduled this playlist in the TMS)

Trailer Updates:

Special Events/ AV set up: 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): The Bling Ring and The Matrix prints were delivered and brought to theater 1

Outgoing/Shipping (content):

Print/video Inspection: Tested the Bound pre-show with Desmond in theater 2; ran through light cues and added necessary automations to the show playlist (also downloaded, ingested, and added all required song files to the show playlist) 

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: