To do this evening/ was completed: Tangerine finished ingesting to the TMS and was transferred to theater 4 (deleted it from the TMS after the transfer was complete); scheduled all first run titles for the upcoming week (Tangerine and RRR show playlists need to be built and scheduled)

Presentation Issues:

Preshow Clips/Playlist: Downloaded and ingested all Jurassic World 3 pre-show content and updated forecast/trailer content from the shared drive; updated all playlists with new forecast content and built a show playlist for Jurassic World 3

Trailer Updates:

Special Events/AV set up: Trivia in Trees Lounge went smoothly; set up the mixer and microphone in theater 4 for Desmond's introduction tomorrow evening 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Flirting Scholar print was delivered and brought to theater 1

Outgoing/Shipping (content):

Print/video Inspection: Finished inspecting Flirting Scholar; lots of splices/scratch marks/changeover cue fixes required throughout but, aside from this, the print is in fair condition

Asset tracking doc updated/checked?: Yes (for Tangerine and Flirting Scholar

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes (sans credit offset information for special event and retrospective screenings)

Marquee updated?: Removed Beyond the Black Rainbow and added letters for Double Team

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes