NPP Projection Report 7/23 Close

To do this evening/ was completed: Dirty Dancing keys were downloaded and uploaded to the TMS

Presentation Issues: 

Preshow Clips/Playlist: A note about the R rated trailer packs for the the week 7/29: adding a third trailer to it will bring the total time closer to 12 minutes over the usual 10 (it's 11:25 to be exact) so I'm not sure whether or not the additional trailer is entirely necessary or if it should be cut from the pack altogether

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Swept booth 1 clean of any dust/dirt buildup (beneath the projectors and make-up table too) and emailed Gerard about ordering more Swiffer Wet Jet pads for use in the booths 

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Behind 3/7 for the weekend

Additional Notes: A seat was removed for the 3:00PM screening of Nope in theater 1; I placed the dolly back beneath the metal counter by the MOD office to keep it off the wall and out of the way (the drill is also charging and back in its bag)

The sound rack backup battery in theater 6 continues to beep intermittently; the readout states "replace battery" even though the battery level is at 100% and the load level is currently at 34% -- this is still not affecting the sound in the auditorium but I am keeping an eye on those numbers to see if they change

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian