NPP Projection 08/22



To do this evening/ was completed: Set up an HDMI connection for Chenelle's tech in T3. We ran the file off of Quicktime. Ran a reel of Out of Bounds for Cristina in T1. Picture looks good and volume has been noted. 

Locally ingested Redline to T2 and teched that with Desmond. Feature is FLAT--it looks great and sounds great at 5.0 volume. Ingested TTYOL feature and made a playlist for 08/26. 

Inspected The Iron Giant and uploaded stills to Google Drive, notified Conrad. The print is in good condition with minimal damage. The few significant scratches have been described on the inspection sheet.

Uploaded keys for The Mummy.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Demolition Man intro and screening went very smoothly. Print is rewound, ready to re-inspected.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?: Yes

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24