To do this evening/ was completed: Inspected the first three reels of Twin Peaks: Fire Walk With Me. The print is in really good condition with relatively minimal base scratching. The only significant damage I noticed was a long vertical emulsion scratch right after the motor cue on reel three. All damage has been logged on the inspection sheet. Uploaded stills to Google Drive and notified Conrad.

One other potential minor anomaly (though maybe it's just something I haven't noticed before): there's often a straight white line that appears at the top of the frame when the film cuts to a new shot. The line is only on the first frame of each new shot. Not sure if it's the way the print was struck--curious to know what it might be.

Presentation Issues: Rounds two and three in T2 did not start as automated. 

When I changed over to reel four of Fifth Element, the screen was black. I immediately realized that I had forgotten to close the lens turret. The screen was black for 3-4 seconds. That's my bad.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Fifth Element screening went smoothly with one presentation hiccup detailed above. Print has been rewound for re-inspection. Dusted off the projectors after the show but did not remove the traps on either projector as they were too hot. Took at a look at them though, and there wasn't any gunk/build-up.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes: