NPP Projection Report 9/16 Close

To do this evening/ was completed: Finished building show playlists for Stardust and Hot Fuzz and scheduled both titles later in the week (cue sheets were updated accordingly)

Presentation Issues: A power surge(?) of some kind occurred during the second round of shows causing the lights in the 4/6 booth to flicker for about ten seconds. The house lights in theater 5 then went to full brightness mid-show because of this and the automated cues stopped working so I had to reset the dimmer control panel from the crawlspace booth to bring them down manually. This ordeal lasted for about two minutes before the lights were brought back down, after which the fire department arrived to check the basement(?) by theater 5 for something I assume was related to whatever was triggered by the surge

Preshow Clips/Playlist: 

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Finished inspecting Mars Attacks!

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?: Behind 3/7 for the weekend

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian