NPP Projection Report 9/25 Close REVISED

To do this evening/ was completed: Downloaded and ingested KDMs for Thirst

Presentation Issues: I heard a crackling sound coming from the left center speaker during the 5:45PM screening of Barbarian in theater 3 and ran a house check once it ended; the speakers in the room sounded fine so I wonder if it wasn't the loudness of the mix that caused the noise

The 9:00PM screening of Moonage Daydream did not start as scheduled in theater 2; I started this round manually and skipped ahead two minutes into the show playlist to compensate for the delay

I also noticed the FLAT masking in theater 2 (specifically during the Moonage Daydream feature) was slightly pillarboxed on the right hand side while the left hand side of the image was more flush with the curtains and the edge of the screen itself; initially I chalked this up to the angle of the projector creating a spacing effect on the edge of the frame but I looked at it again during the last round and tried to adjust the lens file after the show ended (this adjustment proved unsuccessful because the flat lens file is currently as centered as it can be but the feature content, for whatever reason, shows the slightest pillarboxing, despite being cropped to a 1.85:1 aspect ratio)

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers): The Menu one sheet was delivered and stored behind 3/7

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: One of the servers working in theater 5 left a plastic chair part in the server station for us to replace but did not tell me which chair it came from; I left this part with a note attached to it in the utility closet on the third floor for Juan to have a look at in the morning

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian