NWB Projection Report 10/12 Close

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Piggy screening in theater 2 went well (Caryn Coleman and a guest filmmaker made brief introductions before the short/feature content started); I had to discreetly adjust the masking at the start of the short to better fit the 1.33:1 image but aside from that the show ran without any issues

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: I ran the rest of reel 2 of Gates of Hell through the projector in theater 1 and rewound the reel back to its head, placed it back on the shelf with the rest of the film, and cleaned the projector before powering down the machine  

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?: Posters outside the auditorium doors were changed to reflect tomorrow's cue sheets; The Boogey Man poster was printed and left on the desk in booth 2

Cleaning lights on for the night?:

Projection cart by entrance?: The cart was left inside the data closet by the MOD office

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian