NPP Projection Open 11/20



To do this evening/ was completed: Spent some time attempting to set up a cable projection in Trees for the World Cup. Found the right channel on the 4/6 monitor (not 583--that channel kept prompting me to subscribe) but couldn't get anything from the projector in Trees. I've only used it when projecting with an HDMI connection, but I cycled through all inputs and got nothing. Going through the manual I could only find procedure for an HDMI connected projection. I tried to open the game on the bar TVs through Apple TV, but both Fox NOW and Peacock wouldn't let me proceed when I tried to select the game to stream.

Presentation Issues: All three first round OCAP presentations (The Menu in T7, Banshees T4 and Black Panther in T1) were scheduled as CCAP instead. About halfway through Banshees MOD notified me about this, stating there were no captions on screen. I proposed that I could quickly switch files with a 1-2 minute pause and a black screen, or alternatively we could ride it out with the CCAP. MOD elected to keep the shows going uninterrupted. The 2:05 OCAP Black Adam was scheduled as CCAP as well, but I updated the scheduler and went through the rest of the week to make sure each OCAP screening was scheduled correctly. This morning I cross-referenced the cue sheet with the TMS/sales, but did not think to refer to the Nitehawk website itself.

Built a playlist for Ishtar--credit offsets will be teched soon.

Downloaded and ingested the OCAP version of The Menu. It was attached as a zip file in the KDM email sent for the feature. Playlist has been built and scheduled.

Built a playlist for The Fabelmans, rebuilt the Strange World playlist and scheduled the rest of the week in the TMS. Cue sheets have been updated.

Scheduled a pickup for the The Woman Chaser tomorrow. The print is headed to Alamo Drafthouse in San Francisco, and their Fedex number has been entered for billing. Print is resting on the cart near the side entrance.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Brought back XLRs and powerstrip to 4/6 from yesterday's DJ set.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian