NPP Projection Close (McKegg) 1/31



To do this evening/ was completed:
Yes

Presentation Issues: 

Preshow Clips/Playlist: I built the SPL for Women Talking both closed and open caption versions. 

I was able to download  10 and 20 minute Everything Everywhere All At Once preshow clips. The 40 minutes wasn't fully loaded onto the projection drive by the time I left.

I started building it with those preshow clips. I tried ingesting the clips, but couldn't get them on in time. They are on the DCP drive already and need to be ingested. 

Both features need to be tech'd so the proper lighting/volume cues. 

Trailer Updates: 

Special Events/ AV set up: The Clueless show went great! The preshow tech went swimmingly, with it only cutting a minute into the preshow and then the real deal went terrifically! Great show and everything is broken down and back into its place. 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): KDMS for EO, Tar, Knock at the Cabin, M3GANAftersun and Everything Everywhere All at Once are uploaded

Outgoing/Shipping (content):

Print/video Inspection: 

Asset tracking doc updated/checked?: Yes

Maintenance/cleaning: I updated the whiteboard with all the 35 and DCP events for February. 

Cue sheets updated/checked (every shift): I filled out the cue sheets for next week apart from the events, Everything Everywhere All at Once, and Magic Mike's Last Dance. 

I also adjusted some of the automation so that the OCAP screenings are in there. 

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24