NPP Projection Close 2/17



To do this evening/ was completed: Inspected Private Parts print. It's in excellent condition--no splices, no emulsion scratching. Inspection sheet filled out, stills uploaded to Drive, Conrad notified. 

Built R-rated trailer pack for next week 2/24--forecasts downloaded and ingested (even though Kat said these wouldn't be on Drive till Tuesday). CocaineBear_15min downloaded and ingested, as well as Drugs_15min. PG-13 and PG 2/24 playlists feature the same trailer packs as 2/17. All first run 2/24 playlists built.

Put the Lala Land file into HandBrake and started the conversion process--it was at 15% when I last checked and had about seven hours to go--is this usual or did I miss something?

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?: Yes

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24