Projection Admin 2/15 Lillian & Alec



To do this evening/ was completed: 

Presentation Issues:

Preshow Clips/Playlist: Built the playlist for Part Time and Dreamcatcher, though Dreamcatcher needs to be adjusted once Cristina sends us the special slide. 

Downloaded the trailer of TheFly2 for Dreamcatcher playlist. 

Transfered Der Fan to T3. 

Tomorrow we'll snag the credits info for the Live Action shorts (unless Will wants to this evening!)

Trailer Updates:

Special Events/ AV set up: Got a rental confirmed for 2/23 for a 16th birthday party. They're going to choose a BluRay from our collection and Chenelle will drop it off to us soon! Started a playlist. Memo link is here: Party Rental 2/23 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Received and ingested keys for Best Man, Avatar, M3gan, Knock at the Cabin, Close, EEAAO

Fatal Attraction should be here by Friday. 

Ingesting Poetic Justice to the TMS. 

Cocaine Bear playlist can get built and scheduled on Friday when Kat sends over the preshow content. Keys won't get sent/be active for a little while. 

Outgoing/Shipping (content): DHL will be picking up Being John Malkovich tomorrow. John will be returning The Love Witch this week. He knows where to find it!

Print/video Inspection: 

Asset tracking doc updated/checked?:

Maintenance/cleaning: Alec and I spent a considerable amount of time today trying to fix a few errors with the projector in T1. Interlock issues. We deep cleaned, checked, and reseated different parts of the projector apart from the boards. We wound up situating the switch and blower in their permanent, upright positions with zip ties. How this works: the ventilation system should trigger these to stay vertical, but they wouldn't. Chris thinks we need a new Environmental Board. To be honest, I still think there's a few things at play we should consider. Alec and I also discussed getting a fabric exhaust system to replace the one(s) we have (on the roof of the projector). It was tricky to get the belt to stay put. For now, things should be totally fine with the adjustments we made today, but we'll work on this. 

Ordered electrical tape for the booths. Should be here by Friday. 

Cue sheets updated/checked (every shift): Filled out info for Kubo and the Two Strings, Wings of Desire, and Dreamcatcher

Roger is (fingers crossed) hopefully coming to check things out in T1 w/SRD readers this Friday...will update soon. 

Will is going to clean the projectors in T1 tonight and check for any oil seepage. They were really rather oily when I went to project The Love Witch, so I gave them a good clean but they should be cleaned again. Team- please remember to get rid of the gunk in the projector ~ dirt/oil/debris build up that turns into unpleasant stuff that can latch onto the gate area. Check the walls of the projector and beneath the sprockets. Wipe away anything with a microfiber towel and qtips. 

Marquee updated?: Will is checking in on this tonight. 

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24