Projection Admin 2/24



To do this evening/ was completed: Alec and I tech'd the Closing Nite portion of NSF '23. Volume and/or any other adjustments have been added to the tech sheet. Please remember to put this information for festivals on the official tech sheet so that we know where it is. 

 Alec ran Fatal Attraction in T1, I ran Private Parts in T4. Volume has been noted. 

Bowling 4 Eva is converting to DCP, should finish around 7-7:30.

Presentation Issues:

Preshow Clips/Playlist: Started downloading the NSF preshow to the DCPII drive. 

Forecasts 0303 are taking a little while to download. 
Please download j2c file again for 25min NSF'23 preshow.
please download 5min preshow for nsf'23. 15min preshow is all set. 

Tech'd Johnny Guitar in T3 with John. Adjusted the playlist with correct volume/masking. 

Trailer Updates:

Special Events/ AV set up: Update on Persepolis! I'm glad I still have these screen shots I took yesterday. So, Alec mentioned to me today that he ripped the file again just checking the box for the first file (same as I did yesterday), but there's one change he made in Handbrake as opposed to MakeMKV that actually shows the subs. After setting the subtitles to English, you want to make sure that you only click 'Burned In', whereas I had it set to 'both Forced' and 'Burned In.' Here's the thing: Handbrake will default it to both, so just make sure to only check 'Burned In' if you need subs. You can preview this using the Preview feature at the top right of the page, which will give you about a 15 sec preview to check there's subs. 




Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Downloaded DCP of World's Fair

We get the keys to Scarface on 3/2. 

Attack the Block DCP came, it's ingesting to T3. Sony will pick up their print next week.

Outgoing/Shipping (content):

Print/video Inspection: Started re-inspection for Dreamcatcher. I've done the Animatrix reel, plus reels 1 & 2 of the feature. Reels 3 - 7 need to be reinspected. 

Asset tracking doc updated/checked?:

Maintenance/cleaning: Re: T4 issue last night ~ When it comes to the dowser/heat shield mechanism, there's a small clasp that's supposed to hold the pin in place when you shut it. The sides of the clasp needed to be tightened. First image is what this looks like when it's closed, second image is what it looks like when open. This tiny little apparatus can be a bit flimsy, but we should also be gentle when we go to use it.  





Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24