NPP Projection Close 6/12

To do this evening/ was completed: Made the usual rounds throughout the evening and took note of picture and sound (Mission: Impossible could use a slight increase in volume, especially once the crowds get larger over the weekend in the bigger auditoriums); manual start for the final round in T6

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Midsommar FilmFeast in T3 ran very smoothly; set up for karaoke at Trees Lounge (there were multiple complaints about volume levels during this so I brought the master volume on the panel by the bar entrance down which seemed to be in conflict with whoever kept raising the gain/volume on the mixer) 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): A Folded Ocean DCP was copied to the DCPIII drive and was ingested to T2 (Mulan is on the drive as well and can be ingested to T6 tomorrow for the private event on the 17th) 

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes (sans a few manual starts and the private event in T6 everything is set to play as scheduled and is in accordance with the cue sheets)

Marquee updated?: Removed The Fog and added letters for The Muppets Take Manhattan and Twister

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24