NPP Projection Report 7/21 Admin


To do this evening/ was completed: The CP500 in Theater 1 was left on last night and the heat shield (red handle) on the projector was open. Please remember to turn off the 500 and really, really remember to close the heat shield. As a precaution it should always be closed if the motor is not on, even if the lamp is off.

I made some edits to the Oppenheimer housekeeping notes and reprinted them so they're not double sided. Also typed up a step-by-step procedure for setting up and running the show. There are copies on the wall by the platter in 1 and the platter in 4. Please read them all through.

Presentation Issues:

Preshow Clips/Playlist: Possession preshow, next week’s forecasts, and the Back to the Future and Rosie Perez trailers have been ingested.

Trailer Updates:

Special Events/ AV set up: Cleaned P1 and the platter rollers for the show tonight and ran a loop. Oppenheimer is threaded for the 5:30.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Received The Mist, Badlands, and Lethal Weapon 4 prints.

Outgoing/Shipping (content): Printed labels for Twister and scheduled a pickup for this evening.

Print/video Inspection: I put Runaway onto house reels.

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?: Took down Blue Sunshine and put up the marquee rental. Also put away the Indiana Jones/Past Lives letters from the other day. Please put these back on the shelf when you bring them back inside.

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24