NPP Projection Close 8/24
To do this evening/ was completed: Added to the dry erase board in 4/6 with first run and special event titles through the month of September
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Barbie private event in theater 6 went smoothly (a seat was removed for one of the party guests and put back after the show)
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Barbie private event in theater 6 went smoothly (a seat was removed for one of the party guests and put back after the show)
Marie Antoinette finished running through DCP-o-matic and was saved to the DCPIII drive; the drive is on the desktop in 4/6 and the content can be ingested closer to the event date
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Content from the drives in theaters 2 and 3 (Like Water for Chocolate and First Slam Dunk) finished ingesting and were brought back up to 4/6
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Swept up around the 4/6 booths
Cue sheets updated/checked (every shift): Double checked against the TMS; information for tomorrow is accurate
Marquee updated?:
Posters updated?: Added Gran Turismo to the archives poster case behind 3/7 and added a "coming soon" snipe above its poster on display outside
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes: Our closed captioning devices could really use some sort of overhaul as we only have three in the maintenance closet on the third floor of which only two are functional (the other does not have its mount properly attached to it but still receives signals from the booth transmitters)
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Content from the drives in theaters 2 and 3 (Like Water for Chocolate and First Slam Dunk) finished ingesting and were brought back up to 4/6
Feature content for The Mitchells vs. the Machines became available this evening and was ingested to the TMS (CCAP version only; playlist has yet to be built and still needs 9/1 forecast content)
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Swept up around the 4/6 booths
Cue sheets updated/checked (every shift): Double checked against the TMS; information for tomorrow is accurate
Marquee updated?:
Posters updated?: Added Gran Turismo to the archives poster case behind 3/7 and added a "coming soon" snipe above its poster on display outside
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes: Our closed captioning devices could really use some sort of overhaul as we only have three in the maintenance closet on the third floor of which only two are functional (the other does not have its mount properly attached to it but still receives signals from the booth transmitters)
Comments
Post a Comment