NPP Projection Report 9/26 Admin (Jack & Alec) + 9/25 Close


To do this evening/ was completed: TMS scheduled, cue sheets built for the upcoming week, letters up for Rear Window. 

Exorcist: Believer ingested to TMS, Running on Empty ingested to T3.

NoBudge went very smoothly last night.

Cleaned 35s in T1, ran loops afterward, framing and focus set.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: I tested the wireless mics through the PA speakers and it worked well, we will just have to lower the volumes of the mics on the mixer in the booth and remember to reset their levels when we reconnect the mixer to the CP750. This should work well for KGO next week!

Ordering/Receiving (posters & trailers): Got extra Dumb Money and Exorcist posters.

Ordering/Receiving (content): I finished downloading Cora Bora. This wouldn't ingest because all the files hadn't been downloaded. I saw a note in a blog about the DCP having "too many files" but this was not the case, all the files in the Google Drive folder were needed for the complete composition. I know we're used to seeing DCPs with 6 files (preshow content, what we make on DCP-o-matic) but really this is just the minimum amount of files a DCP can have, there's often additional subtitle files and also the content can be broken up into "reels" which will result in multiple audio and video files in the finished DCP. Both those things were the case with Cora Bora.

Ingested the "Digital Curanderas" short. File naming issue. When you get an ingest error saying "file does not exist" this is usually the case. The TMS/IMS will display the name of the missing file in the error message, so compare it to the DCP on the drive and make sure all files are present and named correctly if this happens.

Started downloading the last feature link we have for NewFest. It's This Place. This is downloading on the booth 1 iMac and should finish tonight so please keep an eye on it!

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Gabe from DMS came and changed the AC relay and igniter in the Theater 1 Christie and the flicker seems to have leveled out as a result. We'll keep eyes on it.

He also pulled the logs from Theater 3 to send to Dolby and Christie to try and explain the loss of IMB connection 30 minutes after powering the projector on. I followed up with Jerry and Chris after he left about NewFest, which starts Oct. 14th, and that we need to figure this out before then, as they have several screenings in Theater 3.

I replaced the second spotlight (that was blinking on and off) in Theater 4 with a new one.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian