Projection Admin 10/24
To do this evening/ was completed: TMS has been scheduled (few bits need going over: we don't have Priscilla yet, but we do have The Holdovers and The Killer which still need their playlists built.) I made the cue sheets (titles are done/audio/captions) and I started filling in the times, but this can get tackled more this evening. - L
Presentation Issues:
Preshow Clips/Playlist: Made a few playlists into T6 specific playlists for the this upcoming week. - L
Trailer Updates:
Special Events/ AV set up: Microphone all set for Final Destination 2 this eve. I put the spotlight remote right on the mixer. The 1/4" to xlr cable(s) are in Trees behind the pew for this evening's DJ. I put a 1/8" behind there too, on the off chance someone needs it. - L
Checked the laptop connection in Theater 2 for the Shouting at the Screen slideshow intro, it's all set. Plugged the remote in to charge in 4/6. Wireless mics are also set up under the curtain. Will test them on the PA speakers tomorrow. -AL
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Made the slide for Excess Baggage. This is on the DCPII drive. Can get ingested with the following.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Made the slide for Excess Baggage. This is on the DCPII drive. Can get ingested with the following.
Started downloaded the Halloween_V1.2 preshow content. 5min preshow for this still needs to get downloaded as well as the Hubba Hubba preshow/Holdovers 5min, which is now on the Drive as of this afternoon! This is a lot of preshow. I can do whats left tomorrow morn since it's easier to do this during the AM sometimes.
Uploaded keys for Taylor Swift and The Killer.
- L
Outgoing/Shipping (content):
Print/video Inspection: Tech'd Blair Witch 2 in T1 with Cristina. Print looks great! Volume and info on the white card attached to the first reel. Reel has been rewound. - L
Asset tracking doc updated/checked?:
Maintenance/cleaning: Ran loops and checked in on the projectors in T4 for tonight. - L
Outgoing/Shipping (content):
Print/video Inspection: Tech'd Blair Witch 2 in T1 with Cristina. Print looks great! Volume and info on the white card attached to the first reel. Reel has been rewound. - L
Asset tracking doc updated/checked?:
Maintenance/cleaning: Ran loops and checked in on the projectors in T4 for tonight. - L
Replaced the intake filter on the T3 Christie. -AL
Cue sheets updated/checked (every shift): Double checked today's sheet against the TMS.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Cue sheets updated/checked (every shift): Double checked today's sheet against the TMS.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment