NPP Projection Close 11/9

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Mr. Kneff screening went smoothly as did the intro and Q&A which were both recorded and saved to the PC in booth 1 (the wireless mics sounded very low and needed to be turned up to 10 on the processor)

Assisted Ariel with setting up the turntables for his DJ set this evening at Trees Lounge

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Ripped Elf (Chenelle dropped off a blu-ray this evening) through MakeMKV and Handbrake + began converting it through DCP-o-matic

Face/Off was ingested to the TMS from the DCPII drive

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?: Yes

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian