NPP Projection Close 12/22



To do this evening/ was completed: Inspected reels 3-12 of Godfather Pt II. Print is in good condition overall. All of the reels feature CO cues only 7-8 frames from the end, a few of them 0-5 frames from the end. I added grease cues 24 FFE to the reels that really needed it. This is noted in the inspection form. End of reel seven, beginning of reel eight features an intermission, with multiple sets of cues at the end of reel seven, giving us the option to include or skip the intermission.

T2 booth roof hatch closed with the lock in place.

Migration CCAP transferred to T3.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24