NPP Projection Report 12/9 Open


To do this evening/ was completed: MODs radioed me that one of the tables in T4 was very loose. The bolts were not fastened back on, presumably after the work on the table lights, so I tightened them.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Brunches went well

Ordering/Receiving (posters & trailers): We got a couple posters, Imaginary and Out of Darkness.

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Inspected the first 3 reels of Wizard of Oz. Good looking print, it’s a reissue print with SRD sound and printed for 1.85 lenses, the 1.37 frame is pillarboxed within the 1.85 matte. Should look very good. Reels 1-3 are tails out on the shipping reels in the can.

Asset tracking doc updated/checked?:

Maintenance/cleaning: Checked the plug for the QSC in T1’s booth, the cable was tied quite tightly to the rack which probably led to it shifting a bit over time. I re-tied it with a bit more slack leading to the plug so it should be fine now.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian