NPP Projection Close 1/15
To do this evening/ was completed:
Presentation Issues: None to report tonight (theater 4 has not exhibited any dowser issues and theater 7 continues to intermittently appear disconnected/connected to the TMS)
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Angel Heart screening in theater 2 this evening needed a slight volume boost but otherwise went smoothly
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Transferred the DCP copy of Don't Tell Her It's Me to the DCPII drive and began ingesting it to the projector in theater 1
Outgoing/Shipping (content): Printed a return label for tomorrow for the Angel Heart DCP and brought it down to the cart with the rest of the outgoing materials
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Added a garbage bag to the bin inside booth 1 + swept and mopped throughout
Cue sheets updated/checked (every shift):
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes: The iPad at Trees was not charging so I took the wire and adapter from 4/6 (not the one used for the house music iPad but the one normally plugged into the wall beside the computer monitors) and got it charging again with that; I draped this wire along the wall of the bar to avoid it getting stuck on whatever syrupy residue is on the countertop below
Presentation Issues: None to report tonight (theater 4 has not exhibited any dowser issues and theater 7 continues to intermittently appear disconnected/connected to the TMS)
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: Angel Heart screening in theater 2 this evening needed a slight volume boost but otherwise went smoothly
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Transferred the DCP copy of Don't Tell Her It's Me to the DCPII drive and began ingesting it to the projector in theater 1
Outgoing/Shipping (content): Printed a return label for tomorrow for the Angel Heart DCP and brought it down to the cart with the rest of the outgoing materials
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Added a garbage bag to the bin inside booth 1 + swept and mopped throughout
Cue sheets updated/checked (every shift):
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes: The iPad at Trees was not charging so I took the wire and adapter from 4/6 (not the one used for the house music iPad but the one normally plugged into the wall beside the computer monitors) and got it charging again with that; I draped this wire along the wall of the bar to avoid it getting stuck on whatever syrupy residue is on the countertop below