NPP Projection Close 1/30
To do this evening/ was completed: The night was dominated by the longest 35mm show I've run so far and after prepping for it all month, it went off without a hitch.
Presentation Issues:
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up: The Deer Hunter went great! Despite me trying to chase the framing a bit in the first reel, once we were running, it went smooth. Framing, transitions, focus were all on point. My longest show so far was a success. Everything's shut down and set.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Updated Iron Claw keys are uploaded
Outgoing/Shipping (content): Walter came by to pick up the Heat and Goodfellas trailers
Print/video Inspection: Did a post-inspection of The Deer Hunter. It's on its shipping reels and packed except for the second can where part of the can is now missing.
Asset tracking doc updated/checked?:
Maintenance/cleaning: I cleaned the 35mm projectors in Theater 1.
Cue sheets updated/checked (every shift): I filled out the cue sheets for this coming week. The special event timing and Lisa Frankenstein still need to be filled in.
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?:
Additional Notes: