To do this evening/ was completed:
Presentation Issues: Had to lower the volume for Dune 2 from its original 5.0 setting to 4.5 in theaters 1 and 2 since the former sounded far too loud during some of the action scenes -- crowds in each of these room were quite full but the film at 4.5 strikes a nice balance between levels even with the attendance
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up:
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content):
Outgoing/Shipping (content): Reached out to Sony about scheduling a courier pickup for the Boyz n the Hood print in booth 1 (this has been re-inspected and packaged for return shipment)
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Swept around the 4/6 booth (specifically the stairs up from the landing -- these were coated in a thick dust) and brought a couple compressed air canisters down to booth 1 (left one by each projector for upcoming screenings)
Cue sheets updated/checked (every shift): Double checked showtimes for tomorrow against the TMS schedule and initialed for confirmation
Marquee updated?: Added letters for Taking Off (in addition to letters noting "Part 4" next to Friday the 13th) to the 35mm side + added letters for Love Lies Bleeding and Problemista to the front facing marquee
Posters updated?: Added a "now showing" snipe above the poster for Love Lies Bleeding outside
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes: Updated all current first run titles on the whiteboard in 4/6 + added all relevant information
Presentation Issues: Had to lower the volume for Dune 2 from its original 5.0 setting to 4.5 in theaters 1 and 2 since the former sounded far too loud during some of the action scenes -- crowds in each of these room were quite full but the film at 4.5 strikes a nice balance between levels even with the attendance
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up:
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content):
Outgoing/Shipping (content): Reached out to Sony about scheduling a courier pickup for the Boyz n the Hood print in booth 1 (this has been re-inspected and packaged for return shipment)
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning: Swept around the 4/6 booth (specifically the stairs up from the landing -- these were coated in a thick dust) and brought a couple compressed air canisters down to booth 1 (left one by each projector for upcoming screenings)
Cue sheets updated/checked (every shift): Double checked showtimes for tomorrow against the TMS schedule and initialed for confirmation
Marquee updated?: Added letters for Taking Off (in addition to letters noting "Part 4" next to Friday the 13th) to the 35mm side + added letters for Love Lies Bleeding and Problemista to the front facing marquee
Posters updated?: Added a "now showing" snipe above the poster for Love Lies Bleeding outside
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes: Updated all current first run titles on the whiteboard in 4/6 + added all relevant information