NPP Projection 4/25/24 Close

To do this evening/ was completed:

Presentation Issues: The dowser shut randomly during the pre-show to the final round in theater 1 (this is not the first time this has happened recently) and needed to be opened via the VNC Viewer/touchscreen 

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Placed the turntable case on bar stools at Trees to give Donwill some height for his DJ equipment prior to the Shouting at the Screen event

Hot Potato screening for Shouting at the Screen this evening in theater 2 went very smoothly following a mic check + slideshow/feature volume tech

Knicks game this evening was put on at Trees Lounge

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Dogville redelivery link was sent and the download has been started through an Aspera extension (currently 4.5 hours remaining before the download finishes)

Uploaded keys for Matilda

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: Updated the first run and special events white board in 4/6 with titles through June

Received two packs of 6" wooden stick cotton swabs and brought these up to 4/6

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24