Projection Admin 4/15 Lillian



To do this evening/ was completed: T6 IMS went down towards the end of the first round (Dune), but since it was already in playback, the feature continued to play as normal. Then, during preshow in T2, the projector gave us a communication failure warning and a power supply fan warning and, yes, the APC is something, but we've been having network issues all day, apparently, or at least MOD has been having them, too. I powercycled/reseated T6 and that did the trick. We were late to seat in that theatre, but the rest of preshow/trailers were absolutely fine once we advanced the playlist. T2 (different-ish story) but this happened right after T6. Since the KDM error popped up on T2, I knew there was a strong, strong chance the feature wouldn't play and once the lights didn't go down during trailers, that was it. So I radioed MOD and told them we needed to powercycle (I should have done this earlier instead of gambling on it working and to MOD,  again I apologize). basically the same thing as T3). After re-seating the board I got the marriage connection up and running and went straight into the feature. We'll actually still be relatively on time for our final round. 6 minutes late, exactly, and there's about four tickets sold for final round. We should be just fine for the rest of the night, but should keep an eye on the TMS in case anything changes. I'm writing to DMS in detail, in the thread we already have established.  

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: The film shoot in Trees was great - marquee outside on the 35mm side worked super well. 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): We got the She Wants Revenge trailer, which I ingested via the preshows/trailers drive and added to the R and PG13 trailers packs for this upcoming week. 

Built the playlists for the Rep PG13 and R titles. 

Uploaded keys for Civil War, Dune, Kong

Outgoing/Shipping (content): DHL came to pickup the prints! 

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: Ran loops for Cohen and Tate. Double checked the setup for this evening with wireless mics/Zoom recording. Cristina sent the link this morning. 

Cue sheets updated/checked (every shift): Checked! 

Marquee updated?: Sorted the letters for and put up the whole boat load of titles on the front of the marquee for the Netflix rental tomorrow morning. They might need to rearrange, add or subtract some depending on how they're feeling, but we'll be there in the morning either way. They're coming at 10am, not 7am. Additionally, they just request that all the posters get taken down (not the lobby posters) which Will did this evening. I sorted the letters for the rest of the rental, which will be on the 35mm side, and Will is putting them up. 

Posters updated?: 

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24