NPP Projection 5/19 Admin
To do this evening/ was completed:
Presentation Issues: Kept an eye on theater 6 and there were no issues with playback during the first two rounds
Preshow Clips/Playlist: Built and scheduled a babies Back to Black show playlist for the brunch round in 2 on 5/21 (the feature volume cue has been lowered and the PG trailer pack was added)
Trailer Updates:
Special Events/ AV set up: Ponyo and The Girl with the Dragon Tattoo screenings in theaters 1 and 2 played to modestly sized crowds this afternoon (deleted both features following their respective shows)
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Downloaded and ingested the Generic_GeorgeMiller pre-show folder to the TMS and added it to all Furiosa show playlists
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked/made some adjustments on the TMS and initialed for confirmation
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes: An extra ethernet cable was delivered this afternoon and brought up to 4/6
Presentation Issues: Kept an eye on theater 6 and there were no issues with playback during the first two rounds
Preshow Clips/Playlist: Built and scheduled a babies Back to Black show playlist for the brunch round in 2 on 5/21 (the feature volume cue has been lowered and the PG trailer pack was added)
Trailer Updates:
Special Events/ AV set up: Ponyo and The Girl with the Dragon Tattoo screenings in theaters 1 and 2 played to modestly sized crowds this afternoon (deleted both features following their respective shows)
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Downloaded and ingested the Generic_GeorgeMiller pre-show folder to the TMS and added it to all Furiosa show playlists
Outgoing/Shipping (content):
Print/video Inspection:
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked/made some adjustments on the TMS and initialed for confirmation
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes: An extra ethernet cable was delivered this afternoon and brought up to 4/6
Comments
Post a Comment