To do this evening/ was completed: Staff screening of Crash went very well this morning. Also, there's some important, additional notes below on T4! - L

Presentation Issues:

Preshow Clips/Playlist: Added the slide for Humanist Vampire to its show playlist and updated cues for the intro and Q&A + scheduled show playlists for The Bikeriders on the TMS -WB

Took a look at the feature X since the keys opened today, tech'd it all. There's a long post credits sneak peak of Maxxxine. Info is in the playlist and I'll leave a note for MOD on the cue sheets. Update: I saw Alec already put a note about this on the sheets,  I just tagged Paul with a note as to how long it'll be. - L

Trailer Updates:

Special Events/ AV set up: Ingested Before Sunset to T6, and ingested Heathers to T1! - L

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Double checked all available/missing content for shows this upcoming week and downloaded and ingested additional pre-show files for Janet Planet + converted a slide to DCP for Humanist Vampire (we are waiting on slides for Dangerous Game and Basic Instinct) -WB

Outgoing/Shipping (content):

Print/video Inspection: Re-inspected Crash after the staff screening. Print is still in excellent condition and is back on shipping reels. FedEx labels have been printed out. Print will get picked up tomorrow morning! - L

Asset tracking doc updated/checked?: Yes! The print of Hellraiser is set to arrive sometime tomorrow. 

Maintenance/cleaning: After the staff screening, I thoroughly cleaned the projectors and put the 1.85 lenses and plates back in, giving them a bit of a clean, too. - L

SO! T4. To recap, here is part of what I sent to DMS/tried to do this morning for the ALMS-24: I've rebooted just about everything and have resat every eligible cable and switch. On Saturday night, the fire alarm went off, and T4 was the only one we couldn't properly clear. I did try doing that again this morning, along with rebooting the projector, IMS, and reseating parts of the light panel, to no avail. There has been loads of maintenance work happening in this screening room for over a week now, where the builders are drilling...I'm not sure the work has triggered anything detrimental to the functionality of the ALMS, but it's worth considering.
I mentioned that I have the contact info for the folks we've spoken to before at MIT, but figured I'd reach out to them first since I was curious if this had anything to do with our server. Jerry suggested unplugging some power cables (but I already did that) and that it might be a dead power supply for one of the boards. It's likely that something is off with the transfer from trigger cue to light panel since the lights DO work, just only manually. For this evening, we'll still have to manually adjust the lights in T4. Apologies we haven't sorted this yet. I'll get back on this tomorrow morning to provide any updates. - L

Trash and recycling are out in 4/6. I brought up a bunch of new bags for us. They're at the bottom of the supplies unit where the face shield is. - L

Added print pics of Dangerous Game to the drive. - L

Cleaned the port glass windows in booths 1, 2, 4 and 6 -WB

Cue sheets updated/checked (every shift): 

Marquee updated?: Added letters for The Little Rascals and Conan the Destroyer to the brunch side -WB

Posters updated?: Organized the cubby behind 3/7, added some posters to the trivia section, and tossed posters for older first run titles/films never shown -WB

Cleaning lights on for the night?: