NPP Projection Close 6/27

To do this evening/ was completed: Made the rounds throughout the evening and took note of volume levels for the newer first runs (Kinds of Kindness might need a boost but could use a second set of ears on it...it is opening to large crowds so an adjustment could be needed over the weekend)

Presentation Issues: Had to remove a strip of tape from the right of frame on the port glass window in front of projector 2 -- in booth 1 -- during DOA because of how much it was covering up the picture on screen (there was a noticeably crooked black line along the edge of it and the image looked much better without it) and it should probably remain this way for future scope films


Preshow Clips/Playlist: 

Trailer Updates:

Special Events/ AV set up: Tech'd the "Smack That" video in theater 1 and added a volume cue to the DOA show playlist (it was far too loud at 5.0 so it was brought to 4.2) + DOA screening went smoothly

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Re-inspected the DOA print after the show, packaged it for return shipping, and scheduled a pickup for tomorrow before bringing it downstairs (a return label was included and this was placed atop the box the print was shipped in) + placed the Best of the Best II trailer back on its core and organized the spare leader onto separate cores

Asset tracking doc updated/checked?: 

Maintenance/cleaning:

Cue sheets updated/checked (every shift): 

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?: Yes (with two canisters and one box awaiting pickup)

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open