NPP Projection Close 7/19
To do this evening/ was completed: Made the rounds throughout the evening and looked at the weekly update to brush up on upcoming screenings and events
Presentation Issues: Penultimate round in theater 2 was paused and delayed the start of the pre-show by about 5 minutes; MODs radioed up and the show was started manually
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up:
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content):
Outgoing/Shipping (content):
Print/video Inspection: Finished inspecting Magnolia (it is a massive 10 reels but is in excellent condition overall save for some pretty consistent base scratches throughout) and uploaded stills to the shared drive
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked cues and cross referenced the TMS + initialed for confirmation
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes:
Presentation Issues: Penultimate round in theater 2 was paused and delayed the start of the pre-show by about 5 minutes; MODs radioed up and the show was started manually
Preshow Clips/Playlist:
Trailer Updates:
Special Events/ AV set up:
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content):
Outgoing/Shipping (content):
Print/video Inspection: Finished inspecting Magnolia (it is a massive 10 reels but is in excellent condition overall save for some pretty consistent base scratches throughout) and uploaded stills to the shared drive
Asset tracking doc updated/checked?:
Maintenance/cleaning:
Cue sheets updated/checked (every shift): Double checked cues and cross referenced the TMS + initialed for confirmation
Marquee updated?:
Posters updated?:
Cleaning lights on for the night?: Yes
Projection cart by entrance?: Yes
Additional Notes:
Comments
Post a Comment