NPP Projection Close 7/9

To do this evening/ was completed:

Presentation Issues: Was testing the spots in theater 4 for the intro to The Sandpiper and, after turning these off, almost immediately got a call that the spots were on in theater 3...rushed downstairs to turn these off and refrained from turning them back on during the intro since I did not want to risk somehow(???) turning these on during the feature in theater 3 as the guest was speaking upstairs

Preshow Clips/Playlist:

Trailer Updates:
 
Special Events/ AV set up: The Sandpiper screening in theater 4 went very smoothly (minus the spots for the intro) + cleaned the projectors after the show and closed the exhaust valves to the lamp houses

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Uploaded Fly Me to the Moon keys to the TMS + began converting Dr. Black Mr. Hyde for Shouting at the Screen to DCP in booth 1

Outgoing/Shipping (content):

Print/video Inspection: Re-inspected The Sandpiper after the show and packaged it for return shipping

Asset tracking doc updated/checked?:

Maintenance/cleaning: Tossed the regular trash in 4/6 + brought up additional trash bags for both bins

Cue sheets updated/checked (every shift): Double checked cues/cross referenced the schedule and adjusted accordingly + initialed for confirmation

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes: Updated the first run and special events white boards in 4/6

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open