Projection Admin 7/18 Lillian
To do this evening/ was completed: Ariel, one of our IT people, came in to do some work on the WiFi. He was real jazzed about the fact that we still run analog film.
Presentation Issues:
Preshow Clips/Playlist: Tech'd Twisters. Looks and sounds great at 5.5!
Trailer Updates:
Special Events/ AV set up: Setup for Shouting at the Screen in T2 with the external speakers and wireless mic receiver, changing its function for T2 mics. Everything has been tested, just turn on the power strip/receiver paneling. I found one of the mics by the curtain so I left it in the charging port with the rest of the other mics. Please remember to put everything back at the end of a show, or leave a note for the next person in. Thanks! Aja is ready - laptop has been tested and I'm charging the bluetooth wand in the booth.
Ordering/Receiving (posters & trailers):
Ordering/Receiving (content): Kat sent over the new playlist/trailer info early, the rest of the files will be available a little later on. I downloaded and ingested the new forecasts, mubi crossing trailer, and deadpool 5min preshow for 7/26.
Outgoing/Shipping (content):
Print/video Inspection: We received the print of The Manitou, which is unfortunately pretty damn faded (Although I kinda had a hunch and wanted to check in with it first today to find out. Also has some rough spots of structural damage in the first reel and suffers from vinegar syndrome, despite the image looking quite alright). I sent an image to Cristina early on during inspection. Uploaded some fun photos to the drive already, but I'll finish inspecting this tomorrow.
Alec is re-inspecting Set It Off so we can get it on its way outta here.
Asset tracking doc updated/checked?: Yes
Maintenance/cleaning: This morning, I removed the first right side speaker in T4 (but kept the mount in place) so that the builders could finish up the brick work in there. It was totally fine keeping the mount there. I put it back before opening and tested the channels/content. Everything's working great.
Asset tracking doc updated/checked?: Yes
Maintenance/cleaning: This morning, I removed the first right side speaker in T4 (but kept the mount in place) so that the builders could finish up the brick work in there. It was totally fine keeping the mount there. I put it back before opening and tested the channels/content. Everything's working great.
Took out the trash and recycling in 4/6. Wiped down the surfaces. Dusted off the main rack laptop.
Cue sheets updated/checked (every shift): Checked!
Marquee updated?: Added Twisters to the marquee.
Posters updated?: Added the 'now showing' to the Twisters poster.
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Cue sheets updated/checked (every shift): Checked!
Marquee updated?: Added Twisters to the marquee.
Posters updated?: Added the 'now showing' to the Twisters poster.
Cleaning lights on for the night?:
Projection cart by entrance?:
Additional Notes:
Comments
Post a Comment