NPP Projection Close 8/14



To do this evening/ was completed: Inspected Detroit Rock City. It is in pristine condition. Back on shipping reels for now. Stills uploaded to Drive. Conrad notified.

New Appropriate Behavior DCP ingested to T3.

Crooklyn intro and screening went mostly smoothly but I was having a pretty frustrating time maintaining sharp focus, particularly on P1, which was exhibiting the classic issue of the right third of the frame being pretty blurry while the rest of the image is sharp. Adjusted gate tension to some success but not that much. Undid the tension for reel four (second reel on that projector). Had to ride focus basically the whole time, but reels 3.5 - 6 went pretty smoothly. Not sure if the print itself was partially responsible.

Wasn't able to get to the marquee tonight, apologies.

Presentation Issues: MOD asked for table lights in T1 round two. I told them that I recalled an issue with the lights about a week or two ago. Went through the blogs to try to find info but didn't see anything with my keywords. Turned lights all the way up on the dial and heard a clicking coming from the panel above the switch. Brought the lever down for the last round because I think there was some flickering going on during the preshow.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian