NPP Projection Close 8/28



To do this evening/ was completed: Went through the upcoming week in the TMS and rescheduled everything listed in Matthew's updated PDF. Re-did the cue sheets as well and finished out the week. Would appreciate someone double-checking tomorrow just to be on the safe side.

Went through all the Cheerleader content, feature tech'd, dance numbers tech'd etc. Updated volume and practiced a few transitions with the lightboard. The show went smoothly, with the slight exception of the breakdown slide DCP going black with no audio halfway through its runtime. Not sure why that happened but it was certainly the DCP and no other type of technical glitch. Mics returned to the booth.

While testing lights in T2 booth I noticed a good bit of water on the ground. This was around 3:30. I mopped it up and made sure all of our electronics were dry, then brought a trash can to catch the stream. It's a pretty good leak so I'm glad I caught it early. MOD shut down the unit after the last show and I disposed of the accumulated water. The dripping stopped.

Tracking added for One-Eyed Jacks and Poltergeist III. It looks like Jacks should be here tomorrow.

No issues with T6 today.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian