NPP Projection Close 9/5



To do this evening/ was completed: Spoons went smoothly this evening. Thanks Lillian for the setup. Equipment broken down and returned to the right places.

Re-inspected One-Eyed Jacks. It's packaged up. Outgoing shipping yet to be scheduled.

Inspected all of Cry Baby. It is in excellent condition. Put it on house reels. Will uploads stills.

Cat Video Fest ingested successfully, transferred to T3, but Amadeus failed immediately. I downloaded the remaining files, but yeah, seeing now at the end of the night that it failed instantly. Maybe some files simply need to be removed from the folder?

Presentation Issues: Got a call from MOD towards end of preshow last round in T2: screen was looking particularly dim. Went in to check and indeed it was looking too dim for quality presentation. This was right as the feature was starting. I checked on T5 Administrator Setup after that theater had finished for the night to see if the Foot Lamberts Calibration was accessible during playback, and it is not. Any tinkering would've paused the show, which MOD did not want. So that will have to be addressed tomorrow.

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian