Projection Admin 9/10



To do this evening/ was completed: TMS scheduled for the coming week. Playlists built for Speak No Evil and Cry Baby. 

Ran a reel of Cry Baby for Desmond, volume logged.

Frame and focus set for Madam Satan tonight, projectors cleaned afterward.

NoBudge went smoothly last evening. Mics returned to the booth.

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Mad Dog and Morgan and Condo Painting prints came in and are in 1 

Outgoing/Shipping (content):

Print/video Inspection: Desmond came to take a look at Cardcaptor Sakura and it's looking and sounding good. 

Asset tracking doc updated/checked?:

Maintenance/cleaning: Some simple maintenance in Theater 3 turned into a bit of an ordeal, but all is just fine now. I opened the projector to clean the plastic lamp blower duct on the back of the lamp door and when I powered the projector back on got an error about the PIB connection being lost. Power cycled the projector again and then got errors about firmware mismatches with the PIB and the projector would not power on, it just kept cycling through the process of powering up over and over. After reseating the boards with no luck, I contacted Jerry who suggested reseating the TPC cable and then the boards again, which I did with no luck. He said if this didn't work he would try getting a replacement PIB sent over but I remembered we had a spare, which I put in and which thankfully worked. The projector powered on with no problem. Speaking to Jerry/Matthew about ordering another replacement PIB to have on hand. -Alec

Replaced the air intake filter in the Theater 5 Christie. -Alec

Checked the Trees Lounge projector after Lillian's notes today. It's all fine, a small switch on the HDMI splitter up by the Apple TV had been moved to the wrong spot. I sent an email to everyone about this, but the switch is I think for how the splitter processes the image format from the source out to the monitors/projector. This switch should be on "Copy" and not "Auto." Again, I sent an email to the projection group about this with pictures. -Alec

Went up to booth 2 after the construction crew finished for the day and dusted off the projector, opened the lamp door and cleaned dust out of there, and cleaned the lens, zoom mechanism, and port glass. -Alec

Unpacked the order of Kimtech wipes and placed some boxes in all the booths. Placed an order for more alcohol wipes. -Alec

Cue sheets updated/checked (every shift): Cue sheets for next week are set barring the timing for The Substance and Transformers One, which still need to be added to it. 

Nathaniel walkie'd me noting that the addition matinees of AfrAId that Sony bullied us into adding were not on the cue sheets, so I added the rest of those in as well. 

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection 11/17 Close

NPP Projection Report 4/6 Open

Projection Close 12/28 Lillian