NPP Projection Close 12/5

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Particle Mace party at Trees went smoothly save for a lost connection to a speaker during the DJ set (had to swap XLRs since the wire originally used had been badly coiled causing the connection to come and go)

Spoons Toons & Booze event in theater 1 this evening started on time following a very quick setup and tech (gear was placed beneath the tablecloth off to the side of the screen + mics were brought up to booth 1 to charge for the brunch show on Saturday)

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Finished inspecting reels 1-4 of The Fisher King in 4/6 but hit a bit of a wall with reel 5 as the leader was very badly damaged and shoddily taped together. Added new leader/countdown only to realize the first twenty-something feet of the reel had the same issue and would be a hazard to run through the projector. Reached out to Alec to take a look over it tomorrow since reels 6 and 7 appear fine but it is an extensive amount of damage for us to fix given the amount of creases and sprockets in need of repair (also added stills from the first 4 reels to the shared drive)

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift): Yes

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?: Yes

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open