NPP Projection Report 1/22 Admin


To do this evening/ was completed: Built the cue sheets for the week of 1/24. Our cinema meeting went well! We're waiting on Short Cuts, but we're looking good on content California Split came in this evening and Jack is inspecting it. Staff Screenings have been scheduled and the weekly update is OUT.  - Lillian 

Presentation Issues:

Preshow Clips/Playlist: Built North by Northwest, California Split, and Lifeforce playlists. -AL

Scheduled shows for the week with the exception of Short Cuts, Wages of Fear, and Handmaiden which still need to be built. -AL

Downloaded PS content Thriller V1.2 for Wages of Fear and Handmaiden - I am currently ingesting the 15 and 25min but the 5 min is still downloading to the desktop. - Lillian

Trailer Updates:

Special Events/ AV set up: Converted the new song for tonight to DCP and added it to the playlist. -AL

Set up the mixer, wirelesss mic receiver and speakers in T2 tonight for Nosferatu. Double checked the spots settings for red/red with spots. 703, 704. Friendly reminder to turn on the breakers a couple minutes before using them so they can warm up. Mics are charging in the booth, but everything has been tested. - Lillian 

The hosts for the private event on 2/2 (kids bday) is having trouble with the movie they want to show so will likely choose one of ours. Chenelle will keep us updated. Nothing fancy for this event. The usual. - Lillian 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): We received two versions of North by Northwest but only keys for one. I deleted the one we're not getting keys for and added the correct one to the playlist. -AL

Deleted old playlists. In conversation with folks for Curious Girl and The Fall (the latter of which we night still have on the server at WB) - Lillian 

Outgoing/Shipping (content):

Print/video Inspection: Checked Jimmy Dean, looks good. Raised the volume to 6.5. -AL

Asset tracking doc updated/checked?: Updated -AL

Maintenance/cleaning: Ordered female XLR connectors in an attempt to fix the Yamaha mixer for T1, will let you all know how it goes. -AL

Checked the lamps/diagnostics/content in T7 and T5 just to make sure we're not getting any flickering or other issues. Also, I ordered more canned air since we're low. Should be here soon. - Lillian 

Cue sheets updated/checked (every shift): Yes! 

Marquee updated?: Jack is updating the 35mm side. 

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open