NPP Projection Admin 3/2

To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Double checked the cable connections in theaters 1 and 2 for tonight's Oscars programming this morning and everything is in working order 

Set up a mic and stand in theater 3 for the About a Boy introduction and started the feature after Jared radioed up (brought the stand back up to theater 1 following the show)

Full Metal Jacket trailer and A Clockwork Orange ran smoothly this afternoon + cleaned the projectors after the show and left the 1.66 lenses/plates in place for tomorrow

Assisted Desmond with setting up the step and repeat and red carpet at Trees + connected and tested a mic for the hosts/red carpet correspondent which is connected to the XLR port behind the step and repeat

Ariel set up his DJ equipment for his set this evening (he asked to borrow a 25' XLR cable from 4/6 so please remember to bring that back upstairs)

Touched base with Jack and turned the moving spots on/brought down the wireless mics before leaving for the night 

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Was kept pretty busy throughout the afternoon and managed only to re-inspect the first reel of A Clockwork Orange 

Asset tracking doc updated/checked?:

Maintenance/cleaning:

Cue sheets updated/checked (every shift):

Marquee updated?: Removed About a Boy from the brunch side and replaced it with letters for The Best Oscars Party under a banner that reads "Tonight" ("Brunch Shows" letters are behind 3/7)

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open