NPP Projection Admin 3/7



To do this evening/ was completed: Almost all preshow content downloaded and ingested with the exception of the Cults_5min preshow element, which should be uploaded to Drive tonight.

Most of the 3/14 A1 playlists have been built. Check trailer list for ones that still need manufacture.

Inspected the last three reels of Gladiator. They're in excellent condition.

New 35mm letters up on the marquee.

Presentation Issues:

Preshow Clips/Playlist: Tech'd the entirety of the Opening Nite program with Desmond, John, Cristina and Kat. All shorts look and sound great. The tech spreadsheet has been updated. - L

Trailer Updates:

Special Events/ AV set up: SuperhumanBody keys ingested - L

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Ingested Novocaine, Iron Giant. 
Ingested another program for NSF25 (NoBudge) via the share drive just to keep us on schedule, first three shorts of Closing Nite are also ingesting. More preshow bits ingested - L


Outgoing/Shipping (content): Went through the servers and deleted a lot of content to clear space for our new first runs. - L

Print/video Inspection: Pariah and Gladiator have been techd and rewound. Definitely run loops for Gladiator tomorrow, but particularly for P1. The lenses are set. Double check black tape on P1 port glass. Will likely need to be adjusted. - L 

Asset tracking doc updated/checked?:

Maintenance/cleaning: Vacuumed under the curtain in T1 - L

Cue sheets updated/checked (every shift): Added to the Thursday cue sheet. Added formulas for Novocaine, Black Bag, Opus - L

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

NPP Projection Open 12/28

Projection Admin (and Close) 10/19

NPP Projection Report 4/6 Open