NPP Projection Report 10/12 (Open)


To do this evening/ was completed: Built and scheduled the playlist for The Last Duel. Ingested Firstness for NewFest and moved it to 3. Jerry Kohut from DMS came by this morning to inspect the lamp in 5 and fix the changeover issue in 4/6. The bulb in 5 we thought was new was actually a used one, hence the constant flickering, that had accidentally been placed back in a box marked "new." Jerry replaced this with a new bulb from DMS and set it to its lowest intensity (according to him that bulb model is too bright for that lamp house but it still works). He placed orders for 3 more bulbs for that auditorium at Alec's request. The changeover button on projector #2 in 4 is loose. Jerry checked the backside of the automation panel to see if the connection had come undone but, as far as he could tell, it is just the button itself that is loose and needs replacing. He said he would look for a part from another projector to replace it with. 

Presentation Issues:

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up: Tech screened The Scary of Sixty-First and Cut! in 3 with Desmond. Audio levels were adjusted and credit offset times were updated on the NewFest events spreadsheet. 

Ordering/Receiving (posters & trailers): New posters for Spencer were placed behind 3/7

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection:

Asset tracking doc updated/checked?:

Maintenance/cleaning: 

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projectors off for the night?:

Projection cart by TH5?:

Nest:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24