NPP Projection Report 4/28 Admin


To do this evening/ was completed:

Presentation Issues:

Preshow Clips/Playlist: Built a playlist for the Shouting at the Screen preshow and scheduled it for tonight.

Trailer Updates:

Special Events/ AV set up: Pre-set most of the equipment for Shouting at the Screen. Left the PA speakers on their stands on either side of the screen behind the curtains. Ran an extension cord from the outlet behind the curtain on the right side of the screen over to the speaker on the left and taped it down. Have XLRs for both speakers connected to the mixer, and three very long XLR cables for each mic which will extend to their three seats in the back row. Set the mic levels but the hosts may want to do a quick check before the theater opens. The converter for the laptop to projector connection is ready to go as well, and there’s a spare laptop which will be used during the show to adjust the volume, and play a YouTube clip after the film. Went over all the different components with Jack, should go smoothly tonight.

Set up the turntables for the DJ tonight, everything is connected and Cristina will make sure the DJ brings needles.

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content):

Outgoing/Shipping (content):

Print/video Inspection: Finished inspecting Blade, last two reels were in great condition.

Asset tracking doc updated/checked?: Added tracking for Doctor Strange, it’s coming tomorrow.

Maintenance/cleaning: Installed the new hard drive for our Eclair server. Max remotely updated the software and loaded a test DCP to the server. It didn’t show up when I scanned for it, I let Max know and I’m waiting to hear back.

We received the new AC interlock and radiator filters from DMS. I looked at the interlock on the Theater 1 projector to see if I could replace it, but I didn’t see how it should be removed so I didn’t want to risk it. They were planning on replacing it for us during a service call, anyway.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24