NPP Projection Report 8/8 Close


To do this evening/ was completed:

Presentation Issues: Seems the dowser on the Theater 1 Christie is not closing with the light lock board down. Not much of an issue for digital shows, but for 35mm there will be a brief flash on screen when the lamp shuts off at the end of the digital playlist. This can be avoided by placing a piece of cardboard or something else that will block the light from the lens on the ledge of the port window after the end of the last digital clip. DMS will be bringing a replacement when they come to replace the ballast in the Theater 2 Christie (they’ve ordered one which is on its way to us, should be here Thursday).

Preshow Clips/Playlist:

Trailer Updates:

Special Events/ AV set up:

Ordering/Receiving (posters & trailers):

Ordering/Receiving (content): Received the Fire Walk With Me print, brought it up to booth 1.

Bodies Bodies Bodies drive arrived, ingested to TMS and all IMS servers.

Downloaded and ingested the updated DCP of the Off the Charts extras to Theater 3.

Outgoing/Shipping (content): Malcolm X and Top Gun prints were picked up.

Print/video Inspection: Inspected the Crooklyn print. It’s in great shape.

Asset tracking doc updated/checked?: Added tracking for A League of Their Own, should be delivered tomorrow.

Maintenance/cleaning: Seems the CP750 in Theater 1 is acting up again, I’ve mentioned it to DMS. Last time we brought this issue up they said if it wasn’t the power supply (which at that point it seemed to be, as replacing it resolved the issue) that the processor is likely failing, so we might need a new one.

Cue sheets updated/checked (every shift):

Marquee updated?:

Posters updated?:

Cleaning lights on for the night?:

Projection cart by entrance?:

Additional Notes:

Comments

Popular posts from this blog

Projection Admin 7/19

NPP Projection 11/17 Close

NPP Projection Admin 3/24